TF Gypsum Machinery Manufacture Co., Ltd

gypsum powder plant, gypsum block plant, gypsum board plant, plasterboard production line, gypsum block machine, Manufacturer and Supplier - China(CN)

HomeProductsCompany ProfileNewsInquiryRank (0)

Information for Buyer

  • TF Gypsum Machinery Manufacture Co., Ltd
  • Target Markets: Middle-east, Russia, Africa, Central America
  • Business Type: Manufacturer
  • OEM Service: No
  • Register Time: 2009-03-04

  • (Tai'am , China(CN)) Map
  • Local time: 00:18:36 2009-12-30
  • Phone: +86 /132-87618716
  • Contact Person: Miguel Shi

Products Detail

gypsum powder production line (TF)

Rank :
  • Business Information:
  • Made In : China(CN)

Product Feature:

Introduction of technology:
The Crusher will break the big-size gypsum ore into small 25mm pieces,and then the small pieces will be sent to the grinder , after grinding fine ,the qualified raw gypsum powder will be sent to boiling furnace to calcine , and the unqualified part will be sent to grinder until its qualified .After calcining ,the qualified gypsum powder will be sent to spiral conveyor through hoist .
The spiral conveyor will send the calcined gypsum powder to silo for storage ,and cool the powder during the process .The dust remover is on the top of silo , the unqualified part will be sent to grinder until its qualified.
The stored gypsum will be sent to product storage through steel impeller feeder ,spiral conveyor ,hoist , and send the qualified gypsum powder to storage or workshop finally .
The top pulse bag-type dust remover will collect dust from crusher, particle silo .When the dust and dust gas get into the dust remover through inlet ,the big-size dust particle will fall because the increasing size and decreasing wind speed .The small dust particle will be filtered by filter bag .The filtered gas will be got rid of by outlet .
Production Capacity:
10,000tons/year ---- 200,000tons/year
Quality of Final Product:
Conformity with Chinese National Standard GB/T 9776-1988
Raw Materials:
Content of CaSO4 2H2O in gypsum mine >80%.
The grade of mine and the crystal configuration will influence the quality of semi-hydrated gypsum.
Fuel for Production:
Natural Gas, Oil or Coal
Main Parts of Equipment:
1. Ore Station 2. Crusher
3. Grinding System 4. Calcine Kiln
5. Exit System 6. Material Elevator
7. Silo 8. Entrance System
9. Coal/Natural Gas System 10. Dust Collector
11. Material Elevator 12. Aging Silo


Product Specifications:

Introduction of technology:
The Crusher will break the big-size gypsum ore into small 25mm pieces,and then the small pieces will be sent to the grinder , after grinding fine ,the qualified raw gypsum powder will be sent to boiling furnace to calcine , and the unqualified part will be sent to grinder until its qualified .After calcining ,the qualified gypsum powder will be sent to spiral conveyor through hoist .
The spiral conveyor will send the calcined gypsum powder to silo for storage ,and cool the powder during the process .The dust remover is on the top of silo , the unqualified part will be sent to grinder until its qualified.
The stored gypsum will be sent to product storage through steel impeller feeder ,spiral conveyor ,hoist , and send the qualified gypsum powder to storage or workshop finally .
The top pulse bag-type dust remover will collect dust from crusher, particle silo .When the dust and dust gas get into the dust remover through inlet ,the big-size dust particle will fall because the increasing size and decreasing wind speed .The small dust particle will be filtered by filter bag .The filtered gas will be got rid of by outlet .
Production Capacity:
10,000tons/year ---- 200,000tons/year
Quality of Final Product:
Conformity with Chinese National Standard GB/T 9776-1988
Raw Materials:
Content of CaSO4 2H2O in gypsum mine >80%.
The grade of mine and the crystal configuration will influence the quality of semi-hydrated gypsum.
Fuel for Production:
Natural Gas, Oil or Coal
Main Parts of Equipment:
1. Ore Station 2. Crusher
3. Grinding System 4. Calcine Kiln
5. Exit System 6. Material Elevator
7. Silo 8. Entrance System
9. Coal/Natural Gas System 10. Dust Collector
11. Material Elevator 12. Aging Silo


Contact Now
Send Inquiry Click Here

Other Related Products

TF Gypsum Machinery Manufacture Co., Ltd GoHomeProduct ShowroomCompany ProfileNewsInquiryRank (0)