Join Us |Sign In | User Guide | Inquiry Cart
Years

Hebei Longrun pipeline Group company

pipe fittings, Reducer, Steel Elbow, Elbow, Carbon Steel Tee, Manufacturer and Supplier - China

HomeProductsCompany ProfileCertificatesNewsInquiry

Disclaimer

This company is a Free member of AsianProducts.
If you end up wanting to buy anything from this supplier, we strongly suggest you to use our Escrow service EZ Order. This will ensure a 100% safe transaction.

Information for Buyer

  • Hebei Longrun pipeline Group company
  • OEM Service: No
  • Register Time: 2014-11-30

  • (Shijiazhuang, China) Map
  • Phone: +86/311-66616206
  • Contact Person: Jon Jia

Products Detail

Forged Tee (011)

  • Business Information:

Product Feature:

Product forged steel equal tee
Size range 1/2"-24" are made by seamless pipes, above up to 72" are made by welded pipes
Thickness SCH20 SCH40 STD SCH60 SCHXS SCH80 SCH160 SCHXXS etc are available
Standards ASTMA234,ASTM A420,ANSI B16.9/B16.28/B16.25,ASME B16.9,
JIS B2311-1997/2312, JIS B2311/B2312, DIN 2605-1/2617/2615,
GB 12459—99,EN Standard etc.
Materials stainless steel, carbon steel, alloy steel
Stainless steel(ASTM A403 WP304,304L,316,316L,321. 1Cr18Ni9Ti, 00Cr19Ni10,00Cr17Ni14Mo2,? ect)
Carbon steel(ASTM A234WPB,,A234WPC,A420WPL6. 20#,Q235,10#,20#,A3, Q235A, 20G,16Mn, ect)
Alloy steel(ASTM A234 WP12,WP11,WP22,WP5,WP9,WP91,16MnR, Cr5Mo, 12Cr1MoV, 10CrMo910,15CrMo, 12Cr2Mo1, ect)
Connection But welding,socket welding,threaded
Surface? stainless steel: Polishing, Sand-blasting
carbon steel/alloy steel:
Black?painting,varnish?paint,?anti?rust?oil,?hot?galvanized,?cold?galvanized,?3PE,etc
Application Petroleum, chemical, power, gas, metallurgy, shipbuilding, construction, etc
Package Plastic?film, wooden?cases?,wooden?pallet, or?according to?customers'?request
Certificate API, and ISO9001:2000 Certificates,CE,BV, etc.
Capacity 50000tons/year
Advantages 1.Reasonable price with excellent quality
2.Abundant stock and prompt delivery
3.Rich supply and export experience, sincere service
4. Reliable forwarder
Port of loading Xingang (Tianjin) port
Payment Terms 30% down payment, the balance 70% T/T before the shipment Or L/C at sight.
Delivery Time 7-30 days, according to the order quantity.

FacebookTwitterLinkedinAdd to my favorite Print this pageForward this page